Quoted from LTG:You can't swap one LED board. You have to do the entire system.
If they make a kit ( they might ) it is a lot of work. Strip out all the data harnesses, all the power cables, all the boards. Make the GI tube holes bigger. Install new power supply, new GI tubes. All the LED boards. The HUB and BAG board.
Figure 8 to 10 hours, if you are good at stuff like this.
LTG : )
Why does the new light system for WOZ 2.0 need bigger GI light tube holes? Does it have backup LEDs for when one goes out? Just trying to understand what the difference is that requires the bigger holes.