Trying not to over bomb the forum, so I will keep jaming updates together.
First five long ramps done! Now the wife needs to go to target! Test fitting and playtesting.
I am leaving room for fine tuning on the points that go to flasher and ball return lane. I will include the hardware needed. Screws and washers. You will need to use a washer on both sides of mounts. The return guide screw point in tiny. For my bracket to be tight enough to go on it, they would not be adjustable. I will take pictures of everything and how you should install them with every set. Its easy to do. And here is a picture of height of rail.
First completed and polished wireform shown in two vise jig.
A73D8386-D4B4-4B30-ABAE-D5C07028A3F6 (resized).jpeg
6987ED44-1EB8-472B-8337-11B5B89D1A44 (resized).jpeg002B309F-17B8-460D-AE85-023E1D0B7744 (resized).jpegE01D2B81-58A6-4C2D-B199-D9D72E9B8FF2 (resized).jpeg
78657915-0917-4469-92DA-A6539CDC7DC9 (resized).jpeg602B769F-0C33-410B-BE86-5E1636461215 (resized).jpeg8A6706D5-9A8D-49AC-9FE2-C0D30C77EDBE (resized).jpegD7A2ADF8-36F2-4362-B0AD-F6BE97D6CDCF (resized).jpeg
785EF523-3B40-4322-AA55-5AD8B8E858C2 (resized).jpeg441F11C0-05D1-4F72-905B-128BBD630808 (resized).jpeg