Quoted from Monster_Bash:Six games
[quoted image]
If that's accurate and by no means am I doubting you, Stern need a big kick in the arse for letting these games out of the factory with substandard parts installed. They wouldn't even last a minute in a test bed and they'd know that if all the flipper bats they are receiving are equal. If they don't lift their quality control soon their games are going to be inoperable straight from the box and this has got to damage their brand.