Quoted from dpadam450:Gomez mentioned FCC in an old video talking about Spike 2 Don't own a spooky game, but curious if they have an FCC stamp on their circuit boards.
FCC part 15 testing is not done at the board level, it is done at the product level. And yes, it is required. I'm willing to bet even as an unintentional radiator, you have a clock frequency above the cutoff. There is also the conducted emissions testing that will be required on the power cable.