Quoted from Spyderturbo007:Please bear with me on this one. I'm doing the best I can, but am still getting confused. I set my meter to continuity and put one lead on the Slate/Red wire at the S relay and then the other lead of the meter I connected to the White/Brown wire on the other side of the O relay. When I closed the switch, I got a buzz tone. When the switch was open, there was no buzz. That indicates that the entire circuit is working between those two points, correct?
I tried rotating the score motor with the meter connected, thinking as the motor rotated I would lose connectivity, but oddly enough, I didn't.
Did I do something wrong?
As Steve Young once told me with his signature disdain “Put your damn meter away!”
Continuity testing is not practical on EMs as everything is connected to everything. Just grab your jumper wires and work your way through the circuit.