Quoted from gunstarhero:So it probably took about 10 hours between a friend and I, but a lot of that was me mucking around making the cabinet work harder than it needed to be I think. Probably about 6 hours if you’re organized and efficient.
I just completed my GI Lighting install. It took me about 3 and half hrs from opening the Lighting kit to finish. I didn't note the time it took me for the Topper and Display install but both of them were quicker to install than the lighting. I would think that 6-10 hrs for all three is a probably a good estimate.
Quoted from LTG:The topper kit comes with the micro sd card loaded. The other two kits don't, you do need the 3.0 in the game for the bigger display and RGB GI.
I received a loaded micro sd card and topper board with both my Topper kit and the Lighting kit--so 2 total sd cards and topper boards if you get both of those kits. Seems as if CGC could charge a little less for those of us buying all 3 kits by only including one sd card and one topper board. Oh well, now I have a spare if I ever need it I suppose!