Hey everyone,
Super good news that I can't wait to share, so you're getting it here now. After much back and forth, it appears we have worked out a method for load-out with the Wisconsin Center that will result in significantly reduced pack out time. As a number of people are aware of, we had major weather impacts the past two years as snow moved in and made things difficult because of how limited the ramp space was. This resulted in us essentially having a total of six pick up spots between the two halls for load out, and has made me lose more hair than I care to admit.
Earlier today, a weather contingency plan that involves the ability for us to allow vehicles to pull into the Wisconsin Center for load out has been tentatively approved.
This has been a problem that has vexed me for a long time. One of the things I discovered from notes and details is that last year, we needed approximately 36 total hours of "loading time" to have the entire hall cleared out. This took... let's just say far longer than anyone wanted due to the limited amount of space available for loading.
An extremely conservative estimate (parking spots every 15 feet - normal parking spaces are 9 feet apart) puts our new number of spaces for the load out at 14 if the weather contingency plan would need to happen. At 14 spaces, assuming the same 36 hours of "loading time" is the same, the total load out time of the MGC would be 2.57 hours.
If we used a more realistic estimate of parking spaces ever 10 feet apart, this plan puts the number of spaces for the load out at 20. The same 36 hours of "loading time" would mean load out would only take 1.8 hours.
I feel compelled to note the above times include both the vendor hall and the game center. Arcade picking up moves a lot quicker than vendors though, so the line should move very fast for everyone on here.
Assume that we will need an extra 30 minutes to prep to start bringing cars in, but I believe that this will result in an extremely fast load out time for this coming year no matter what the weather. Three hours of load out time would be comparable to arcade load out times at the Sheraton. Two hours of load out time would be equal to the best years.
By the way, if the weather is fine, we can park on the West side of the dock and load out to vehicles that way, which allows over 30 spots at any given point in time to be loading. Our total "loading time" would probably go up slightly due to the slightly longer walk to load cars, but even if we assume a 25% penalty for slightly longer walk, the "not a snowpacolypse" plan would allow everyone to load and leave within 1.5 hours of the show ending, without any prep time to bring cars in.
I know people have been asking about how we intend to handle that this year. I wanted to tell you this here because quite frankly, I'm super excited about this as it gives us the options we didn't have in the past few years to handle this properly.
Tons of new stuff coming soon. I can't wait to tell you all what is up our sleeves this year. And then I can't wait for you all to GTFO on Sunday night in half the time or less
YAY!