Quoted from ATLpb:I've googled, I've pinside searched. Perhaps I'm missing it, but could someone please A) type out the exact order from Front to Back of the stock setup for Metallica Drop Target assembly on each rod, top and bottom; or B) share several close-up pics.
i'm looking for something like this for example (don't know if this is correct, just an example!)
Front to Back, Top Rod:
Metal Assembly, thin washer, drop target, thin washer, spring, fat washer, e-clip, etc. etc.
Front to Back, Bottom Rod:
Metassembly, thin washer...etc. etc...
I'm tweaking my drop targets and it's a nightmare. Thought I took enough detailed BEFORE pics, I most certainly did not.
I'm feeling quite inadequate as I even have pics shared with me of the diagrams in the manual and I'm still stumped.
Top, from front to back: metal assembly, washer, drop target, thin washer, spring, washer, e-clip (same order for all three drops)
Bottom, from front to back: metal assembly, washer, drop target, e-clip.