Not to hijack this thread, rather add to it. I just finished my GS swap. A few things I learned. Overall, very, very happy with Wade's latest effort. A couple screw holes were missing, but easy to add. The pre-drilled holes are a better match for the common screw diameters. Side rails and those top posts for the tent lane dividers need to be enlarged a bit. I use a slotted driver bit in a battery drill to save time. Top side is still mostly hand work. I must be slow here because I estimate it took about 24 hours to tear down the old, organize, and repopulate the new. Not counting all the cleaning and rebuild time for all equipment.
20160122_194808_(resized).jpg
20160122_123648_(resized).jpg
20160122_113326_(resized).jpg
20160121_212502_(resized).jpg
20160121_203634_(resized).jpg
20160121_191336_(resized).jpg
20160121_174834_(resized).jpg
20160121_143233_(resized).jpg
20160121_140805_(resized).jpg