I’m having an issue with my trough eject on JP and I can’t seem to find a schematic for that assembly.
The issue is the VUK eject doesn’t always put the ball in the shooter lane. It’s about 50%. The rest of the time the ball falls back down.
I replaced the coil sleeve. Nothing seems to be mechanically binding. Does anyone has a photo of their trough coil or a schematic for the assembly? Thanks