Quoted from bob_e:do the math = 4680
Ok, drop out some holidays call it 4500.
but then you need orders for those games
That's assuming they build 6 days a week for the whole year.
I don't think they will be doing that. Manufacturing 6 days a week can only be done for so long before you burn your crew out. The only way you can do that long term is if you have the man power that allows them only work 5 days a week but man the line for 6 days a week.