What would be really cool is if CGC did an overrun of SE’s now to build up inventory of that model (since it’s already on the line) and then turn them into SE+’s to ship simultaneously with LE’s as the toppers were being built. They could effectively ship SE+’s and LE’s at the same time and speed up their production/delivery window to make room for a new title/MMR by 2023.