Now that my Xenon rebuild is complete, it is now time to start on Capt. Fantastic. Here are some pictures of the game and the teardown.
Overall the game is not in too bad of shape and was playing before the teardown. I have not seen many posts of an actual rebuild of a Capt Fantastic start to finish, I'm sure there are some out there, but I thought I would try and we'll see how it goes.
20190226_133717 (resized).jpg20190226_133652 (1) (resized).jpg20190226_133733 (resized).jpg20190226_133759 (resized).jpg20190226_133843 (1) (resized).jpg20190226_135637 (resized).jpg20190226_141830 (resized).jpg20190226_141830 (resized).jpg
I started getting into the lower cabinet teardown today. The bottom had a sheet of plywood nailed to it to cover the hole that the actual bottom had in it. So that gets thrown in the burnpile and the actual bottom gets removed and will be replace due to the hole. The legs look ok but I am not sure if they are supposed to be painted or chrome, so if someone know please let me know. The rest all needs cleaned and shined up.
20190227_090553 (resized).jpg20190227_091022 (resized).jpg20190227_094504 (resized).jpg20190227_131457 (resized).jpg