Quoted from viper001:Chicago Gaming is building all the cabinets and playfields at their facility and transporting them over to Stern for assembly. Neither of those two components would be impacted by UL issues and I have to believe there is a fair amount of lead time on each one. If they are shooting for 2014 shouldn't there be pictures of that production process already cranking those out?
No because neither place is going to warehouse the cabs. its not cost effective, pins will be build when everything is available, get it in the building, then out as fast as possible.